1578 32nd St.
ESCOPE OF WORK: SHALL INCLUDE THE CONVERSION OF AN EXISTING BASEMENT WITHIN THE EXISTING PRIMARY BUILDING ENVELOPE, (BASEMENT) INTO AN 850 S.F. ADU BY ADDING A NEW SLAB FLOOR/FOUNDATION, FRAMING, INSULATION, (2) BATHROOMS WITH SHOWER, TOILET AND SINK, KITCHEN WITH SINK, REFRIG, ELECTRIC STOVETOP, CABINETS, AND A (2) BEDROOMS INCLUDING
NECESSARY PLUMBING, MECHANICAL AND ELECTRICAL SYSTEMS. INSTANT HOT WATER HEATER, AND CLASS A ROOF. AN ADDITIONAL SQUARE FOOTAGE OF 440 S.F. AT THE REAR OF THE BUILDING SHALL BE ADDED TO THE BUILDING FOOTPRINT AND CONDITIONED AIR SPACE.
Edit City, Alabama, US
Desired Start Date: 2/1/2023 12:00:00 AM